Gets or sets whether circular references are evaluated.
Syntax
Visual Basic (Declaration) | |
---|
Property Iteration As Boolean |
Visual Basic (Usage) | Copy Code |
---|
Dim instance As IIterationSupport
Dim value As Boolean
instance.Iteration = value
value = instance.Iteration |
C# | |
---|
bool Iteration {get; set;} |
Property Value
Boolean:
true to recalculate circular references;
false otherwise
Example
This example specifies that circular references are evaluated with the number of iterations being three and the amount of change being 5.
C# | Copy Code |
---|
FarPoint.Win.Spread.Model.IIterationSupport iis;
iis = (FarPoint.Win.Spread.Model.IIterationSupport)fpSpread1.ActiveSheet.Models.Data;
iis.Iteration = true;
iis.MaximumChange = 5;
iis.MaximumIterations = 3;
fpSpread1.ActiveSheet.SetValue(0, 0, 10);
fpSpread1.ActiveSheet.SetValue(0, 1, 20);
fpSpread1.ActiveSheet.SetValue(0, 2, 30);
fpSpread1.ActiveSheet.SetFormula(0, 2, "B1+C1");
fpSpread1.ActiveSheet.SetFormula(0, 0, "A1*C1"); |
Visual Basic | Copy Code |
---|
Dim iis As FarPoint.Win.Spread.Model.IIterationSupport
iis = FpSpread1.ActiveSheet.Models.Data
iis.Iteration = True
iis.MaximumChange = 5
iis.MaximumIterations = 3
FpSpread1.ActiveSheet.SetValue(0, 0, 10)
FpSpread1.ActiveSheet.SetValue(0, 1, 20)
FpSpread1.ActiveSheet.SetValue(0, 2, 30)
FpSpread1.ActiveSheet.SetFormula(0, 2, "B1+C1")
FpSpread1.ActiveSheet.SetFormula(0, 0, "A1*C1") |
Requirements
Target Platforms: Windows 2000 Professional (SP4), Windows 2000 Server, Windows 2003 Server (SP1), Windows 2008, Windows XP (SP2), Windows Vista, Windows 7, Windows 8
See Also