ComponentOne Reports for WinForms Designer Edition: ComponentOne Reports for WinForms > Working with C1ReportsScheduler > User Interface > Task List

Task List

The task list appears at upper part of the main window and consists of a grid with several columns where you can add various tasks to complete. Each task defines a report or document scheduled for generation. The task list appears similar to the following image:

 

 

The task list is represented by a grid with the following columns:

      File Name

The File Name column lists the name of the C1Report, C1PrintDocument, or executable file on which to schedule an action. For C1Report/Imported C1Report type of tasks, this is the name of the report definition file, for C1PrintDocument type of tasks, this is the name of C1D/C1DX file containing the document, and for external executable type of tasks, this is the name of the executable file to run. To select a file, click the ellipsis button to the right of the file name text box.

      Report Name

Used only for C1Report/Imported C1Report tasks, this column specifies the name of the report. It's a combo box: when a report definition file is selected in the first column, the combo drop-down box is automatically filled with available reports' names.

      Report Type

This column specifies the type of the current task. The following report task types are supported:

 

States

Description

C1Report

For tasks of the C1Report type, an instance of C1Report component is used to load the report definition and generate the report.

Imported C1Report

For tasks of the Imported C1Report type, an instance of C1PrintDocument component is used to import the report definition and generate the report.

C1PrintDocument

For tasks of the C1PrintDocument type, an instance of C1PrintDocument is used to load and generate the document.

External executable

Tasks of the External executable type are represented by external programs. The intention is to run applications that rely on code when generating reports.

 

      Task state

This column shows a small image representing the current state of the task. Note that this column does not have a caption. Image indicators used in the column include:

 

 

Description

A gray ball representing an unchecked task.

A green ball representing a successfully checked task that is currently not running.

A yellow ball representing a successfully checked task that is currently running.

A yellow triangle with an exclamation mark representing a task that has errors.

 

      Status

This column shows the current state of the task. States include:

 

States

Description

Ready

Task is ready but is not scheduled. This is the only status allowing to edit the task.

Scheduled

Task is scheduled for execution. Changes are not allowed to a task with this status.

Busy

A scheduled task that is currently running. Changes are not allowed to a task with this status.

Paused

Task is scheduled for execution but the schedule is paused. Changes are not allowed to a task with this status.

 

To manipulate the task list, use the Task menu or the toolbar on the left of the task grid:

 